MIL-STD-2197A(SH)
Step Number |
Operation 3/ |
Solution Number |
Voltage |
Anode plus or minus |
Ampere hours required |
Ampere hours drawn |
Remarks |
Remarks: |
NOTES:
FIGURE 1. Sample Job Record - Continued.
1/ Provide a brief description of the type, location, and extent of damage. Use "remark" section for sketch, if
feasible.
2/ Provide sequential instruction (Example: (1) Remove corroded area to sound metal; (2) Inspect ground area for defects; (3) Nickel plate to plan dimension plus 0.010 inch; (4) Machine to plan dimension (5) Inspect plated and adjacent surface).
3/ Record actual operational data.
13
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business