MIL-STD-868B CHANGE 2
SUMMARY OF CHANGE 2 MODIFICATIONS
Paragraph 2.3, Non-Government Standards & Specifications: Changed SAE-AMS-S-
13165 with SAE-AMS-2430, Shot Peening.
The following detail requirement of MIL-STD-8688 has been revised, paragraph
5.3.2, Step Number 2:
New Requirement: Parts shall be dry blasted using 80 - 320 grit aluminum (AI2O3), silicon dioxide (SiO2), or garnet per MIL-STD-1504. Elapsed time between completion of cleaning and the next step shall not exceed four (4) hours.
Old Requirement: Parts shall be dry blasted using 80 - 320 grit aluminum (AI2O3), silicon dioxide (SiO2), or garnet per MIL-STD-1504. Elapsed time between completion of cleaning and the next step shall not exceed sixty minutes.
Reworded paragraph 1.2.2 and took shall out.
Removed "plating" from paragraph 6.2, "Subject terms "key words" listing" and added
"Methods"/"Procedures."
v
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business