MIL-DTL-5002E
acceptance comply with all requirements of the contract. Sampling in quality conformance does
not authorize submission of known defective material, either indicated or actual, nor does it
commit the Government to acceptance of defective material.
6.7 Subject term (key word) listing.
Anodic coatings
Ceramic coatings
Corrosion control
Metallic coatings
Plating
6.8 Changes from previous issue. Marginal notations are not used in this revision to identify
changes with respect to the previous issue due to the extent of the changes.
Custodians:
Preparing activity:
Army - MR
Navy - AS
Navy - AS
Air Force - 11
(Project MFFP-2010-002)
DLA - CC
Review activities:
Army - AR, AV, EA, MI
Navy - OS
NOTE: The activities listed above were interested in this document as of the date of this
document. Since organizations and responsibilities can change, you should verify the currency of
the information above using the ASSIST Online database at https://assist.daps.dla.mil.
16
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business